Preempting On‑Site Coordination Issues

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #1056715
    elvira12
    Participant

      I’m finalizing permit‑ready drawings for a challenging home addition—tight framing layouts, complex ductwork, and crowded plumbing runs—but worry hidden conflicts will stall construction and trigger costly rework. What’s the best way to catch these coordination errors before breaking ground?

      #1056853
      osmany.damoney
      Participant

        To avert field surprises, I commissioned a professional Constructability review early in design. Their engineers ran clash‑detection on my BIM model, flagged every joist‑duct and pipe‑beam conflict, and delivered red‑lined plans with sequencing optimizations. They also verified all clearances against code and provided a detailed coordination log. By folding their findings into my permit set, inspections sailed through, subcontractors followed a clash‑free blueprint, and the build progressed on schedule saving weeks of downtime and thousands in change‑order fees.

      Viewing 2 posts - 1 through 2 (of 2 total)
      • You must be logged in to reply to this topic.
      Back to top button